How to Calculate Printing Cost per Meter – Profit Analysis Guide
How to Calculate Printing Cost per Meter – Profit
Analysis Guide
A
Competitive Printing Rate Can Still Make a Loss
A textile printing order may look
profitable when the quotation is prepared, but the final result can be very
different. Printing paste consumption may exceed the estimate, machine
efficiency may fall, rejected fabric may increase and overhead expenses may
remain unaccounted for.
The biggest costing mistake is
calculating only the direct material cost and treating the remaining expenses
as profit.
For a printing mill, the correct approach is to calculate the complete production cost, divide it by the saleable printed metres and then add a suitable profit margin.
This guide explains how to build
that calculation using a practical textile printing order.
First,
Define What Your Printing Rate Includes
Before calculating cost per metre,
establish the scope of the order. Two printing quotations may look similar but
include different services.
|
Costing scope |
What it covers |
|
Printing service only |
Printing paste, labour, machine operation, energy and
related overhead |
|
Printing with finishing |
Printing plus drying, curing, washing or other required
finishing |
|
Complete fabric supply |
Printing-related costs plus the base fabric and any
included processing |
This article focuses on printing
and its associated production costs, excluding the purchase cost of the
base fabric. If the mill supplies the fabric as well, its cost must be added
separately.
Another important factor is fabric
width. A metre of 1.80 m wide fabric contains more printed area than a metre of
1.50 m wide fabric. For accurate comparison, record both linear metres and
usable width.
Build
the Cost Sheet: Every Taka Needs a Place
A reliable printing cost sheet
should separate direct production expenses from indirect operating expenses.
Direct
production costs
These expenses are directly related
to the printing order.
|
Cost component |
What to include |
|
Printing paste or ink |
Actual consumption multiplied by purchase rate |
|
Printing chemicals |
Thickener, binder, auxiliaries and other required
chemicals |
|
Labour |
Operators and production workers assigned to the order |
|
Energy |
Electricity, steam, drying and curing energy |
|
Setup |
Design preparation, screen preparation and machine setup
where applicable |
Indirect
production costs
These expenses support the operation
but may not belong to one individual metre of fabric.
- Machine depreciation and maintenance.
- Factory rent and production overhead.
- Quality inspection and testing.
- Production planning and supervision.
- Cleaning, handling and other operating expenses.
These costs should be allocated
using a consistent method, such as productive machine hours or production
volume. Avoid counting the same expense twice.
The
Core Formula
Printing Cost per Metre = Total
Printing Production Cost ÷ Saleable Printed Metres
The important word is saleable.
If 10,000 metres enter production but only 9,500 metres pass inspection, the
cost must be recovered from the 9,500 saleable metres.
For a more detailed costing sheet:
Total Printing Cost = Material +
Labour + Energy + Setup + Machine Cost + Allocated Overhead + Other Production
Expenses
This calculation gives the
manufacturing cost before adding the desired profit.
Worked
Example: Costing a 10,000-Metre Printing Order
Consider a hypothetical rotary
screen printing order. The factory processes 10,000 metres, but after
inspection, 9,500 metres are accepted for delivery.
The following figures are
illustrative and do not represent standard market rates.
|
Cost component |
Order cost (BDT) |
|
Printing paste |
180,000 |
|
Other printing chemicals |
45,000 |
|
Labour |
80,000 |
|
Electricity and steam |
65,000 |
|
Machine maintenance and depreciation |
55,000 |
|
Screen and setup cost |
40,000 |
|
Allocated factory overhead |
75,000 |
|
Other production expenses |
30,000 |
|
Total production cost |
570,000 |
Now calculate the actual cost:
Total production cost = BDT 570,000
Saleable printed quantity = 9,500
metres
Printing cost per metre = 570,000 ÷
9,500
Actual printing cost = BDT 60 per
metre
Notice that dividing by the original
10,000 metres would give BDT 57 per metre. That figure understates the true
cost of each saleable metre because it ignores the rejected output.
From
Production Cost to Selling Price
Knowing the cost per metre is only
half the job. The mill must also decide how much profit it wants to earn.
For a target gross profit margin:
Selling Price = Cost per Metre ÷ (1
− Target Gross Margin)
Using the example above, assume the
factory targets a 20% gross margin.
Selling price = 60 ÷ (1 − 0.20)
Selling price = BDT 75 per metre
The order's financial result would
be:
|
Financial indicator |
Amount |
|
Saleable quantity |
9,500 metres |
|
Selling price |
BDT 75/metre |
|
Total sales revenue |
BDT 712,500 |
|
Total production cost |
BDT 570,000 |
|
Gross profit |
BDT 142,500 |
|
Gross profit margin |
20% |
Margin
vs Markup: Do Not Confuse Them
This distinction matters when
preparing quotations.
- Markup
is profit calculated as a percentage of cost.
- Gross margin
is profit calculated as a percentage of selling revenue.
For example, adding 20% markup to a
BDT 60 cost gives a selling price of BDT 72. That produces a gross margin of
only 16.67%, not 20%.
A mill targeting a 20% gross margin
should therefore use BDT 75 in this example.
Why
Two Similar Printing Orders Can Have Different Costs
The printing rate should not be
copied blindly from one order to another. Several production factors can change
the cost per metre.
Design and colour coverage: A design with greater printed area or more colours may
consume more printing paste and require additional preparation.
Printing method: Rotary screen, flat screen and digital printing have
different material, setup, machine and operating costs.
Order quantity: Screen preparation and other fixed setup expenses are
spread over the order quantity. Smaller orders generally carry a higher setup
cost per metre.
Fabric width: Wider fabric increases printed area per linear metre and
may change the material consumption and machine-loading calculation.
Production speed: Lower output per hour increases the labour, machine and
overhead cost allocated to each metre.
Quality and rejection: Shade variation, print defects and reprocessing reduce
saleable output and increase the effective cost.
Where
Printing Mills Commonly Lose Profit
|
Costing weakness |
Financial consequence |
Better control |
|
Estimating paste consumption |
Material cost exceeds budget |
Measure actual consumption |
|
Ignoring setup cost |
Small orders become underpriced |
Allocate setup by order quantity |
|
Using processed metres |
Cost per saleable metre looks too low |
Use accepted output |
|
Underestimating energy |
Operating cost is understated |
Track machine-wise consumption |
|
Ignoring reprocessing |
Extra expenses remain hidden |
Record correction and rejection costs |
|
Applying markup as margin |
Selling price misses profit target |
Use the correct margin formula |
A Simple Costing Control System
A printing mill can improve
quotation accuracy by following a consistent costing procedure.
- Collect order information: Confirm fabric width, order quantity, design, colours,
printing method and required finishing.
- Prepare the material estimate: Calculate expected paste, ink and chemical
requirements using an approved production trial or reliable historical
consumption data.
- Estimate machine and labour costs: Use expected production hours, machine rates and
labour allocation.
- Allocate overhead:
Apply the factory's approved overhead method consistently.
- Include production losses: Use realistic allowances based on historical rejection
and reprocessing records.
- Calculate cost per saleable metre: Divide total estimated cost by expected accepted
output.
- Set the selling price: Apply the required gross margin and check the
quotation against commercial conditions.
- Compare actual and estimated results: After production, review the cost variance and update
future estimates.
Turn
the Cost Sheet into a Profit Improvement Tool
A cost sheet should not be prepared
only when a new order arrives. It should also help management identify why
actual production cost differs from the quotation.
Monitor these indicators regularly:
|
KPI |
Measurement |
|
Printing cost per metre |
Total printing cost ÷ saleable metres |
|
Paste consumption |
Paste used ÷ printed metres or area |
|
Production efficiency |
Actual output ÷ planned output |
|
Rejection rate |
Rejected metres ÷ processed metres × 100 |
|
Reprocessing rate |
Reprocessed metres ÷ processed metres × 100 |
|
Energy cost per metre |
Printing-related energy cost ÷ saleable metres |
|
Gross profit margin |
Gross profit ÷ sales revenue × 100 |
Compare similar designs, fabric
widths and printing methods to make the results meaningful.
The
Final Commercial Check
Before confirming a printing
quotation, make sure the cost sheet includes all relevant production expenses,
the correct saleable quantity, the agreed finishing scope and a realistic
profit margin.
A low quotation may win an order,
but winning an order is not the same as earning a profit.
The strongest printing cost
calculation is one that reflects the real cost of every saleable metre—and
protects the mill's profit before production begins.

Post a Comment